Plenty of Melbourne lifts can’t be done from the property itself. Tight blocks, rear-access units, and inner-suburban streets often mean the crane has to set up on the road, footpath, or nature strip — and the moment it does, council permits come into play. Here’s what you need to know, and the short answer to the most common question we get: yes, your crane company can organise all of it for you.
Do you need a permit to put a crane on the road?
Yes — if any part of the crane (including outriggers) occupies the road, footpath, or nature strip, you need a permit from the local council. Lifts performed entirely from within private property don’t need one. The permit is usually called a road occupation permit (some councils call it a road/footpath occupancy or temporary road closure permit), and it authorises the temporary use of the road reserve for the lift.
Why do councils require it?
Councils manage local roads under Victoria’s road management laws, and they’re responsible for keeping roads safe for everyone. The permit process ensures traffic and pedestrians are managed around the crane, emergency access is preserved, residents and businesses are notified, and the road surface and assets (drains, trees, street furniture) are protected.
What’s involved in getting one?
A typical application involves:
- A traffic management plan (TMP) — prepared by an accredited traffic management company, showing signage, cones, traffic control, and pedestrian detours around the crane. For partial or full road closures, traffic controllers are usually required on the day.
- The council application — submitted with the TMP, dates, times, location plan, and the crane company’s public liability insurance certificate.
- Fees — application and occupation fees vary by council and by how much road is occupied and for how long.
- Conditions — councils may restrict hours (e.g. outside peak times or school drop-off), require resident notification letterboxing, or limit the closure duration.
If the road is a major arterial managed by the state (rather than the council), additional approval from the state road authority may also be required — your crane or traffic management company will identify this when they assess the site.
How long does a crane road permit take in Melbourne?
Lead times vary between councils, but as a rule of thumb: allow 5–10 business days for a simple footpath or partial lane occupation, and 2–4 weeks for a full road closure, especially in the CBD and inner suburbs where notification requirements are stricter. The single most common cause of delayed lifts is leaving the permit too late — if your job might need one, mention it at quote stage.
Who organises the permit?
Either the client, the builder, or the crane company can apply — but in practice it’s fastest to let the crane company coordinate it, because the application needs crane-specific details: the crane’s footprint and outrigger spread, set-up position, insurance details, and the TMP that’s built around the actual crane configuration. At Combination Cranes & Transport we handle the permit application, the traffic management plan, and the traffic crew on the day, and we build those costs into your fixed quote so there are no surprises.
What happens if you skip the permit?
Lifting from the road without a permit risks council fines, the job being shut down on the spot (while you still pay for the crane time), and — most seriously — insurance complications if anything goes wrong during an unauthorised occupation. Against the cost of the lift, the permit is cheap. It’s never worth skipping.
What does it cost?
Costs vary by council and scope: a simple footpath occupation might add a few hundred dollars, while a full street closure with traffic controllers, notification, and after-hours work can add considerably more. You’ll get the exact figure in your quote once the site has been assessed — see our guide to what crane hire costs in Melbourne.
Need a lift in a tight street?
Combination Cranes & Transport handles council permits, traffic management, and the lift itself — one quote, one call.
FAQ
Do I need a council permit for a crane on the road in Melbourne?
Yes. If any part of the crane or its outriggers occupies the road, footpath, or nature strip, a road occupation permit from the local council is required. Lifts done entirely from private property don't need one.
How long does a crane road permit take?
Allow 5–10 business days for a simple footpath or partial lane occupation and 2–4 weeks for a full road closure, depending on the council. Inner-city councils generally take longer.
Who applies for the crane road permit?
Anyone can apply, but it’s usually fastest for the crane company to coordinate it, since the application needs crane-specific details and a traffic management plan. Combination Cranes & Transport handles permits and traffic management as part of the job
How much does a road occupation permit cost?
It varies by council and scope — from a few hundred dollars for a footpath occupation to considerably more for a full road closure with traffic controllers. Your crane quote should include these costs once the site is assessed.